Reference | Size | Rib Depth | Weight/M2 |
GHR L | 2200X445mm | 21mm | 3.39kg |
GHR M | 2200X445mm | 21mm | 4.86kg |
GHR H | 2200X445MM | 21mm | 6.34kg |
Hi Rib , Setting up a stop end for construction joints
- Hi Rib (1) is nailed to a corner or shaped bracing (2) Ribs should not be damaged or distorted during fixing. The closed expanded metal rib work point towards the first concreted section as the expanded metal rib work here is exposed to the most pressure. The expanded metal rib work is arranged cross -wise to the bracings.
- Hi Rib requires the same concrete coverage a reinforced concerete. In order to maintain the specified concrete coverage, the upper and underside of the component are fitted with wooden strips (3) as spacers and nailed to the bracings (2).
- The bracings (2) themselves are nailed to the formwork and held in place by wooden bars (4) supported by the existing armouring